Second Generation Nissan Xterra Forums banner

1 - 4 of 4 Posts

·
Registered
Joined
·
20 Posts
Discussion Starter #1
Engine, transmission, transfer case and gas tank skids have all be delivered in 30 days. The gas tank skid brackets still needed powder coat so they didn't make it but should be shipped soon.
 

·
Registered
Joined
·
1,334 Posts
congrats!! glad shrockworks pulled through with you also! got mine last week. took them about 6 weeks. pretty good.
 

·
Registered
Joined
·
20 Posts
Discussion Starter #4
I finally uploaded the pictures after I installed them awhile back. Took me about half a day to do by myself with some ramps and a floor jack to help.



Left overs...:salute:
 
1 - 4 of 4 Posts
Top